Money spent on the refurbishment in 2011 was largely wasted. The roof still leaks and the special wall lining to the corridor and stairs has made the plaster blow.
The £000s spent on refurbishment some years ago was largely wasted by poor oversight. The shoddily finished corridor wall linings have had to be ripped out and are being redone.
LU recently wasted £000s here on poor quality refurbishment work. Roof still leaks, wall linings are blown and waiting rooms invariably locked. But the few staff are friendly.